|
|
|
Final Report |
|
The Final Report summarizes the work performed in the technical reports and proposes original mechanical system desig alternatives. These alternatives include the design of an additional geothermal well field and the implementation of radiant floor slabs. Additionally, breadth analyses were completed on the construction management of the new mechanical system designs as well as their effect on the building's electrical system. The Executive Summary provides a brief summary of the report and its results. |
Note: While great efforts have been taken to provide accurate and complete information on the
pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of David Blum. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
This page was last updated on 9/1/2010, by David Blum and is hosted by the AE Department ©2010 |